Concrete Slab Cost Calculator

Compare bags with a ready-mix delivery using your own quotes. See the quantities to order and where each estimate comes from.

Live resultUSD 340.00Lower quoted estimateView results ↑

Your inputs

Choose a rectangular or round slab and enter its dimensions. Open the two quote sections to set your bag yield, prices, delivery terms, and labor. All starting prices are editable examples.

USD amounts; no exchange conversion. Imperial measurements. Use 1,234.56 number format.

Multiply matching slabs using the quantity field.
ft
Finished slab length.
ft
Finished slab width.
in
Enter your planned thickness; this tool does not design it.
slabs
Whole number with these same dimensions.
%
Your allowance for uneven ground and handling.
Bagged concrete quote
cu ft
Read the product label; 0.6 cu ft is an example yield.
$/bag
Example only; enter your local quote.
$
Enter 0 for collection without a charge.
$
Total labor/equipment estimate for this option.
Ready-mix quote
Select the unit used by your supplier; the amount is not auto-converted.
$/cu yd
Example only. Use the selected supplier pricing unit.
cu yd
Minimum volume billed by the supplier; 0 means no minimum.
cu yd
Order rounded up to multiples of this volume.
$
Total fixed charges from your quote.
$
Total labor/equipment estimate for this option.
Shared costs and tax
$
For example forms or base work; counted in each option.
%
Applies to all modeled costs, not a local tax rule.

Use the yield printed on your bag and your supplier’s actual minimums. Currency changes do not convert prices or select tax rules.

Results

Live
Lower quoted estimateUSD 340.00Ready-mix
Difference in estimatesUSD 94.00using the costs you entered
Bagged totalUSD 434.0062 whole bags
Ready-mix totalUSD 340.001.5 cu yd billed volume
Volume needed1.358 cu ydincludes 10% allowance
Whole bags to buy620.6 cu ft yield per bag
Ready-mix order1.5 cu ydminimum and order increment applied
Measured slab area100 sq ftall matching slabs

Estimates include the entered costs only. Tax applies to the whole subtotal; enter 0 if using tax-inclusive quotes.

What this result includes

A quantity and quote comparison, not structural design or a live price service. No automatic reinforcement, excavation, pump, strength specification, labor productivity, or regional tax calculation. Enter those costs explicitly when relevant. Bags are rounded up; ready-mix minimums and increments may exceed the volume used. Supplier pricing units remain explicit when measurement preferences change.

Breakdown reflects the current valid inputs.Breakdown unavailable. Correct the highlighted inputs to update.

Compare the two quotes

USD; 10% allowance; yield 0.6 cu ft per bag; 62 bags versus 1.5 cu yd (1.14683 m³) billed ready-mix. Prices are user-entered examples, not live quotes. Tax applies to the whole modeled subtotal. Dimensions estimate volume, not structural adequacy.

Compare the two quotes
Cost itemBaggedReady-mix
Concrete materialUSD 434.00USD 240.00
Delivery / supplier feesUSD 0.00USD 100.00
Labor / mixingUSD 0.00USD 0.00
Other project costsUSD 0.00USD 0.00
Tax on all entered costs (0%)USD 0.00USD 0.00
Total estimateUSD 434.00USD 340.00

Reference formulas and worked examples below keep their stated units. Monetary examples use USD; dimensional examples use US customary units unless labeled otherwise. Metric calculator inputs are converted to these reference units before calculation. Choosing another currency does not convert example amounts or exchange money.

How to use this concrete slab cost calculator

Choose a rectangular or round slab and enter its dimensions. Open the two quote sections to set your bag yield, prices, delivery terms, and labor. All starting prices are editable examples.

How the calculation works

Rectangular area = length × width; round area = π × (diameter ÷ 2)². Multiply by matching slabs, thickness, and (1 + waste percentage ÷ 100) to find required concrete volume.

Whole bags = required volume ÷ the entered mixed yield, rounded up. Bag material cost = whole bags × price per bag.

Billed ready-mix volume = the greater of required volume and minimum billed volume, rounded up to the supplier’s order increment. Price per cubic meter or cubic yard is applied in the selected unit.

For each option, add its material, delivery, and labor amounts plus shared other costs. Multiply this subtotal by (1 + tax rate ÷ 100). The lower result uses only the entered costs.

Worked example

A 10 × 10 ft slab, 4 in thick, with 10% extra needs 36.6667 cu ft. At 0.6 cu ft yield and $7 per bag, buy 62 bags for $434. With a 1 cu yd minimum and 0.25 cu yd increments, ready-mix bills 1.5 cu yd. At $160/cu yd plus $100 delivery, it costs $340. With no other costs or tax, ready-mix is $94 lower.

Limits and assumptions

A quantity and quote comparison, not structural design or a live price service. No automatic reinforcement, excavation, pump, strength specification, labor productivity, or regional tax calculation. Enter those costs explicitly when relevant. Bags are rounded up; ready-mix minimums and increments may exceed the volume used. Supplier pricing units remain explicit when measurement preferences change.

Frequently asked questions

Why can ready-mix billed volume exceed what I need?

The supplier may bill a minimum load and sell in volume increments. Both are editable, and the result shows the billed quantity separately from the slab requirement.

Can I use metric measurements and a price per cubic meter?

Yes. Select Metric in Currency & units and choose Price per cubic meter in the ready-mix quote. Measurement switching converts dimensions; it does not silently change a quoted price unit.

Does changing currency convert the quote?

No. The currency labels change, while the amounts stay as entered. Use one currency consistently for the comparison.

Does the lowest material price always win?

No. Whole bags, delivery minimums, fees, and different labor costs can change the total. Enter each option’s complete quote before comparing.

Is the default thickness suitable for my project?

The thickness is an editable example. This calculator does not select safe structural thickness, reinforcement, or a mix specification.

References

QUIKRETE Concrete Mix #1101: manufacturer bag-yield specifications